Completed: |
April 1992 |
Project Value: |
$5,074,000 |
| Area: |
355,200 sf
33,700 sm |
| Number of Cars: |
739 |
| Owners: |
Sifton Properties, London
London Life Insurance Company, London |
| Architect: |
Crang and Boake Inc., Don Mills |
| Structural Engineer: |
Carruthers and Wallace, Toronto |

Construction Details:
JHS Forces built 4 floors of a reinforced concrete underground
parking structure plus 22 floors of a stair/elevator tower and office slabs on steel deck.
This work was done in joint venture with PCL Construction of Toronto.
Concrete work started in March 1991 and was completed in April 1992
Total Concrete Quantity = 26,012 cm.

|
|